- Joined
- Jan 30, 2022
- Messages
- 489
The first 4 locations have already been installed.
The next 8 locations are pending.
One thing that I want to mention: the numbers of chargers are the "Number of Charging Ports" divided by 2 since each CCS count as 1 port and each CHAdeMO also count as 1 port.Thanks for the update. I've added these to the database. Looks like the Sagle site is actually installed, powered on, and probably very close to being operational.