This was referenced in an earlier thread, but funding has now been accepted by the City of Starkville, which should allow for permitting and construction to proceed. I would suggest a PLANNED status for this site.
Location: 33.46282796699259, -88.81479452822855
250 East Lampkin Street, Starkville, MS 39759
Based on the description in the articles, I expect this will be a 2x62.5 ChargePoint CPE250 site with a paired output of 125kw.
Plugshare Link: Lampkin Street Parking Lot | PlugShare
Location: 33.46282796699259, -88.81479452822855
250 East Lampkin Street, Starkville, MS 39759
Based on the description in the articles, I expect this will be a 2x62.5 ChargePoint CPE250 site with a paired output of 125kw.
Plugshare Link: Lampkin Street Parking Lot | PlugShare