Francis Energy's installs appeared to have stalled

I was pretty surprised to see the buildout of Francis Energy sites in Oklahoma. I wonder why that "enthusiasm" hasn't transferred to other states? Do you think they are getting disappointing usage in OK and have slowed down their buildout in other areas?
 

This is what Francis Energy said

screen-shot-2022-01-19-at-6-28-04-pm-png.png
 
A lot of pending Francis installs popped up in their app around June 30/July 1. However, it was short lived and disappeared a few days later. I wish I had taken a screenshot of them.

All the pending sites had the typical 3 character location identifier followed by xx instead of a number. So, for example, "ASHxx" for the station in Hobbs. All were listed as 150 kW Power Electronics units with 1 CCS and 1 CHAdeMO.

The following sites were labeled as pending (offline & with the aforementioned location ID in the form "ABCxx") :
Alamogordo, Des Moines, Fort Sumner, Hobbs, Roswell, and Tucumcari.

I can confirm that Roswell and Alamogordo are fully installed and just need utility connections/meters. I'm not sure the install status of all the other sites.
 