This thread is for discussion of the Shiretown Inn and Suites fast charger

Provider: Non-Networked

Address: 282 North St, Houlton, ME, 04730

GPS: 46.144648,-67.841576

Stalls: 4

Hours:
 
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2

From RFP for Phase 4 Round 2, minimum is only 2 CCS, 150kW+ shared, 1 CHAdeMO 50kW+:

1. For Tier 1 sites: Not less than two (2) and not more than four (4) DCFC ports
where:
i. At least one (1) port must be able to serve EVs using the CHAdeMO
standard and be capable of delivering at least 50kW;
ii. At least two (2) ports must be able to serve EVs using the CCS standard;
and,
iii. At least two (2) ports that use the CCS standard must have the capacity to
deliver at least 150kW, provided that these two ports need not each
deliver 150kW simultaneously. This requirement may be satisfied by
Efficiency Maine Trust Phase 4-2 DCFC - EM-013-2023
11-02-22 Page 12
sharing output between two ports to deliver 150kW when only one
vehicle is charging at a time.
iv. Electrical service sized to accommodate expansion to four (4) 150kW
chargers providing 600kW of total demand in the future.
 
Sorry, I've been swamped trying to keep up lately (no thanks to all the CPOs that just love deleting all their AFDC entries and adding them back in with slight changes that I need to review)...just getting to your updates now. Thanks!
 