Fastcharger - Canton - AYERCO AYERSCANTON DC1

fcibot

New member
Staff member
Joined
Sep 5, 2021
Messages
2,851
This thread is for discussion of the AYERCO AYERSCANTON DC1 fast charger

Provider: ChargePoint Network

Address: 1700 Oak St,Canton,MO,63435

GPS: 40.123455,-91.53866

Stalls: 1(CHAdeMO [?]:?, CCS [?]:?)

Hours: 24 hours daily
 
An anonymous user submitted a change proposal to lower the power level of this site to 72kW. I checked the ChargePoint site and it does state that the site is operating at reduced power, but technically the stations are capable of 125kW operation through pairing, so for now I'm going to go on the assumption that the power reduction is merely temporary (one Plugshare comment indicated the reduction would be through 9/30, which I realize we are already past). If anyone has any additional details, please share them here.
 
Back
Top