Fastcharger - Bangor - Shell / Ledbetter's Super Stop

fcibot

New member
Staff member
Joined
Sep 5, 2021
Messages
3,052
This thread is for discussion of the Shell / Ledbetter's Super Stop fast charger

Provider: Non-Networked

Address: 322 Stillwater Ave, Bangor, ME, 04401

GPS: 44.822343,-68.760857

Stalls: 4

Hours:
 
This appears to have been cancelled.

Clues:
(1) Phase 6 (2nd NEVI) RFP was updated from 1 location in Hermon, ME to 2 in the Bangor area
(2) The general page doesn't mention it:

The section for Phase V mentions 7 locations but only 6 are listed and this Bangor one is missing.

(My bold)
Efficiency Maine said:
Phase V: EV Fast Charging in Augusta, Bangor, and Along U.S. Route 1

Efficiency Maine has announced seven awards to install new DC Fast Charging ports along I-95 in Augusta and Bangor, and along U.S. Route 1.

High-speed chargers will be installed at the following locations:

D&C Properties, 423 East Main Street, Searsport – 2024
Irving Oil, 1555 Atlantic Highway, Waldoboro – 2024
Midcoast Regional Redevelopment Authority, 11 Atlantic Avenue, Brunswick – 2024
ReVision Energy, 225 High Street, Ellsworth – 2024
Tesla, Inc., 197 Civic Center Drive, Augusta – 2024
Tesla, Inc., 75 Maverick Street, Rockland – 2024

It wasn't the best location, being at an exit that Northbound was exit only and maybe it was pointed out and disqualified under the 1 mile rule. Or maybe something made Equilon (Shell) or the host pull out.
 
Okay, will delete the entry. If it comes back we can add it again.
 
Back
Top