As listed at EV Charging Initiatives - Efficiency Maine the Phase V NEVI award for Augusta address changed to
281 Civic Center Drive, Augusta, which is the address of a Comfort Inn and 99 Restaurant.
It's going to be a 16-stall V4 Tesla Supercharger. The Permit was found for it and is shown...
The Rockland, ME Supercharger is under construction at the Hannaford at 75 Maverick Street and pictures at Tesla Motors Club show that it will have V4 stalls.
https://teslamotorsclub.com/tmc/posts/8007372/
That's consistent with it having CCS, as it's one of the Phase V (NEVI Phase 1) locations...
I submitted a change of address and GPS location.
I also submitted a change to 8 chargers.
Tesla Motors Club had a thread about Superchargers under construction in North Hudson, NY. https://teslamotorsclub.com/tmc/threads/north-hudson.315584/
Links a local TV story...
This appears to have been cancelled.
Clues:
(1) Phase 6 (2nd NEVI) RFP was updated from 1 location in Hermon, ME to 2 in the Bangor area
https://www.efficiencymaine.com/rfp-em-010-2024/
(2) The general page doesn't mention it...
I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 1
https://www.efficiencymaine.com/opportunities/rfp-em-008-2023/
https://www.efficiencymaine.com/docs/EM_008_2023_DC_Fast_Chargers_Phase_4.pdf
From RFP for Phase 4 Round 1, Tier 1 minimum is only 2...
I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2
https://www.efficiencymaine.com/opportunities/rfp-em-013-2023/
https://www.efficiencymaine.com/docs/Phase4-2_RFP_013_2023_UPDATED_2023-07-28.pdf
From RFP for Phase 4 Round 2, Tier 2 minimum is only 2...
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2
https://www.efficiencymaine.com/opportunities/rfp-em-013-2023/...
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2
https://www.efficiencymaine.com/opportunities/rfp-em-013-2023/...
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2
https://www.efficiencymaine.com/opportunities/rfp-em-013-2023/...
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2
https://www.efficiencymaine.com/opportunities/rfp-em-013-2023/...
There is a 62.5kW CCS/CHAdeMO ChargePoint at Darling's Hyundai
439 Western Ave, Augusta, ME 04330, USA
About 44.320055900135756, -69.82031137955106.
(Based on the photo on Plugshare, the Plugshare pin is wrong. I should be able to get a more precise location soon.
Plugshare: Darling's...
I think this should be marked permanently closed. Maybe it's temporary but it's not shown in the EVGo app and has been removed from PlugShare.
I think that after the last time it was repaired and then blew it got culled.
(Fortunately there's now another DCFC charger in Augusta that needs to...
The Phase 1 and 3 all sites awarded have been installed, with only Ellsworth not yet open (needs transformers), so I expect these as well.
I should have included the main pages which have link to the RFPs for each of those.
Phase 4 Round 2: RFP EM-013-2023 - Efficiency Maine
Phase 5 (NEVI): RFP...
Lists below have the company receiving the award and then the address of the charging location.
Phase 4 Round 2 - ARPA
https://www.efficiencymaine.com/docs/RFP_EM_013-2023_Notification_of_Award.pdf
1. Irving Oil, 1941 Medway Road, Medway, Maine 04460
2. Universal EV LLC, 282 North Street...
Under construction and close to complete. Looks like it just needs tape removing and to be turned on. Fresh power pole already has its 3 pole-mounted transformers (which is what I expect at Belfast, ME and Ellsworth, ME).
Chargers are at the highway-side edge of the lot, at the end of the gas...
Somebody posted a picture on TeslaMotorsClub.com.
1 ChargePoint DCFC under construction (along with 1 destination charger) at the 76 (Google shows it as a Mobil).
https://teslamotorsclub.com/tmc/threads/supercharger-not-quite-packwood-wa.303700/
Comparing the photo on TMC with Google Maps...
Definitely fully up and running.
I did a run to Belfast, ME Hannaford on Monday and diverted on my way back but I was at an SoC too high to prove the power sharing.
OK, just checked PlugShare again. Somebody updated. Construction.
https://www.plugshare.com/location/475535
https://photos.plugshare.com/photos/1138372.jpg
Poster said they're in the mall lot behind McDonalds. That's at the Harbor Freight end, not the Hannaford end (where the Tesla...