DonTom
Active member
- Joined
- May 30, 2023
- Messages
- 231
74 charge station locations with two ports per location would be MUCH better.There are 37 charging stations and per NEVI they need to have at least four (4) charging ports per station
The number of charge stations is rarely an issue. The number of different locations is the big issue, IMO.