703 Industrial Park Dr, Las Vegas, NM 87701
ChargePoint Network
4 x 62.6 kW
ChargePoint Network
4 x 62.6 kW
Hi, I'm the person who found that location and posted the photos on PlugShare. Sorry, I tried my best to capture the location of the new chargers. The best photo that I took was showing the NMDOT blue sign; that is the current poster image on PlugShare.Weird that the person that posted the picture you didn't include, helpfully showing the location of the site in relation to the Park & Ride sign, didn't place the Plugshare pin very accurately (in fact, it's way off!) I think I got it more or less in the right spot here.
Yes, that image is the one that certainly helps nail down the correct pin position! Thanks!Hi, I'm the person who found that location and posted the photos on PlugShare. Sorry, I tried my best to capture the location of the new chargers. The best photo that I took was showing the NMDOT blue sign; that is the current poster image on PlugShare.
I spoke with NMDOT on the phone on Friday and they aren't finished being setup (provisioned). They are intended to be two paired 125 kW installs. The official told me the target date for them to go live is September 7th. They needed to fix the wiring between paired units.Looks like 3 out of the 4 stations are now live in the ChargePoint app.
I understand but if you watched the entire video in the X post (tweet) you'd see that I was completely unable to charge even though the app said 1 station was available.I get that it may not be at its full power level (something typical at first), but they are showing as available in the app, so I had already marked it as open. I will adjust the power once they get them linked up.
Good news!I will adjust the power once they get them linked up.