Multiple locations

Thanks for the update. I've added these to the database. Looks like the Sagle site is actually installed, powered on, and probably very close to being operational.
 
Thanks for the update. I've added these to the database. Looks like the Sagle site is actually installed, powered on, and probably very close to being operational.
One thing that I want to mention: the numbers of chargers are the "Number of Charging Ports" divided by 2 since each CCS count as 1 port and each CHAdeMO also count as 1 port.
 
Yeah, I figured that was probably the case, but I hesitated to actually commit to that assumption in the event that maybe some of them will be putting in dual-CCS units capable of simultaneous charging.
 