Fastcharger - Machias - Machias River Inn

fcibot

New member
Staff member
Joined
Sep 5, 2021
Messages
2,828
This thread is for discussion of the Machias River Inn fast charger

Provider: Non-Networked

Address: 103 Main St, Machias, ME, 04654

GPS: 44.719023,-67.451307

Stalls: 4

Hours:
 
This location was added as 4 stalls but the requirement only needs 2 stalls. I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 2

From RFP for Phase 4 Round 2, Tier 2 minimum is only 2 CCS, 150kW+ shared, 1 CHAdeMO 50kW+:

2. For the Tier 2 site: Not less than two (2) and not more than four (4) DCFC ports
where:
i. At least one (1) port must be able to serve EVs using the CHAdeMO
standard and be capable of delivering at least 50kW;
ii. At least two (2) ports must be able to serve EVs using the CCS standard;
and,
iii. At least two (2) ports that use the CCS standard must have the capacity to
deliver at least 150kW, provided that these two ports need not each
deliver 150kW simultaneously. This requirement may be satisfied by
sharing output between two ports to deliver 150kW when only one
vehicle is charging at a time.
 
Back
Top