Fastcharger - Baileyville - Irving Oil - Baileyville

fcibot

New member
Staff member
Joined
Sep 5, 2021
Messages
2,828
This thread is for discussion of the Irving Oil - Baileyville fast charger

Provider: ChargePoint Network

Address: 32 Houlton Rd, Baileyville, ME, 04694

GPS: 45.123328,-67.348559

Stalls: 0

Hours:
 
I've submitted a site update based on the minimum requirements.
This is part of Phase 4 Round 1


From RFP for Phase 4 Round 1, Tier 1 minimum is only 2 CCS, 150kW+ shared, 1 CHAdeMO 50kW+:

1. For Tier 1 sites: Not less than three (3) and not more than four (4) DCFC ports
where:
i. At least one (1) port must be able to serve EVs using the CHAdeMO
standard and be capable of delivering at least 50kW;
ii. At least two (2) ports must be able to serve EVs using the CCS standard;
and,
Efficiency Maine Trust Phase 4 DCFC - EM-008-2023
11-02-22 Page 12
iii. At least two (2) ports that use the CCS standard must have the capacity to
deliver at least 150kW, provided that these two ports need not each
deliver 150kW simultaneously. This requirement may be satisfied by
sharing output between two ports to deliver 150kW when only one
vehicle is charging at a time
 
Back
Top