968205.jpg
971224.jpg
971225.jpg


This site is currently under construction.

Red E network

Brookings Activity Center
317 5th Ave, Brookings, SD 57006, USA
44.308691770884096, -96.79729678018491
https://www.plugshare.com/location/359539
 
Thanks! Added.

While a new concrete pad may the eventual location of the station, without trenching/conduit/etc, it's not conclusive. The Plugshare comment indicated that construction would commence 7/25, so if there is a more conclusive construction update, let me know and I will adjust the status in the database.
 
That article's behind a paywall, so can't really check it out. But the evidence I'm looking for is not really the site, but rather whether construction has begun or not.
 
Someone reported that the location is live and was able to charge from it.

Interestingly, this charger can charge two CCS vehicles at the same time.

993160.jpg
 
I will assume two CCS connectors from the picture (assuming the Mach-E on the left is actually plugged in).

Not sure whether this is a 60kW or 120kW unit...checkin seemed to indicate 50kW charge rate, but that's not really conclusive information. If anyone local can determine what speed charger this is, please let us know.
 